Delta Charter Township – Old River Trail Shared Use Pathway

  • Design and constrution engineering for 0.50 miles of shared-use path construction to connect Delta Mills Park and Hunters Orchard Park with the existing path network.
  • Completed through the MDOT LAP process and included 240 feet of timber boardwalk and a 75’ prefabricated steel pedestrian bridge to cross Carrier Creek and the wetlands adjacent to Carrier Creek.
  • Much of the project was constructed within the 100-year floodplain of the Grand River and included detailed coordination and permitting with the Michigan Department of Environment, Great Lakes, and Energy (EGLE).