Remembrance Road Improvements

City of Walker, MI
Remembrance Road Construction

The Remembrance Road project consists of one half mile of roadway improvements and adjusting the road cross section to three lanes with bike lanes on both sides of the road. This will result in a narrower pavement width. The project also includes reconfiguring and reconstructing the Remembrance Road and Leonard Street Intersection with concrete pavement, new traffic signals, drainage improvements, curb and gutter, sidewalk and HMA resurfacing with reinforcing material placed over joints that are in the existing concrete base. The estimated cos is $1,350,000 and is funded with construction NHPP funds and a local match from the City of Walker.